Can I change my power capacity?

By law, you can make one power modification per year, although experience tells us that you can in fact decrease and increase it as many times as you want. This modification has some associated costs, which the distributor in your area charges and are regulated by the Ministry of Industry:

Decrease power cost: 9,04€ + + 21% VAT

Increase power cost:

  • Access tax: 19,70€ + 21% VAT x times the difference of kW (from the actual power to the desired power)

  • Extension tax: 17,37€ + 21% VAT x times the difference of kW (from the actual power to the desired power)

  • Hitch rights: 9,04€ + 21% VAT

The amount will be charged on the first bill with the power change.

If you want us to change the power of your contract, please contact us by sending an email to hola@octopusenergy.es.